Project | Barry’s Beach Marine Terminal Stormwater – Upgrade |
Location | Barry’s Beach |
Client | GBG Concrete & Construction Pty Ltd |
18 tonne Whaler Beam used as a water barrier support.
Stringent weld procedures were developed and implemented specifically for this project.
The project required 100% pass on all welds and fabrication accuracy had to meet strict tolerances, all of which formed part of our extensive quality management system.
![](https://i0.wp.com/rmeng.com.au/wp-content/uploads/sites/11/2015/05/BBMT1-scaled-1-jpg.webp?resize=2560%2C1714&ssl=1)
![](https://i0.wp.com/rmeng.com.au/wp-content/uploads/sites/11/2015/06/DSC_0044-scaled-1-jpg.webp?resize=2560%2C1714&ssl=1)
![](https://i0.wp.com/rmeng.com.au/wp-content/uploads/sites/11/2019/01/DSC_0037-scaled-1-jpg.webp?resize=2560%2C1714&ssl=1)
![](https://i0.wp.com/rmeng.com.au/wp-content/uploads/sites/11/2019/01/DSC_0025-scaled-1-jpg.webp?resize=2560%2C1714&ssl=1)
![](https://i0.wp.com/rmeng.com.au/wp-content/uploads/sites/11/2015/06/DSC_0027-scaled-1-jpg.webp?resize=2560%2C1714&ssl=1)